What 5D BIM based pre-construction does for your projects
BIM-based fast and accurate Quantity Takeoff
Quantity surveyors can easily generate automated quantities from 3D models using the predefined rules in the system. The calculations can be displayed in BIM models, simplifying decision-making.
BIM-based thorough and precise estimates
Combining 3D models and data from previous projects helps rapidly create thorough and precise project estimates. Estimates are interconnected with models, BoQ, scheduling and procurement, further enhancing collaboration and data sharing in real-time.
BIM-based scheduling enables better planning for uncertainties
5D simulation helps schedulers to identify potential conflicts and detect construction risks early in the planning process, creating more reliable schedules to avoid costly mistakes in the construction phase. It offers “what-if” scenarios that provide visibility into the impact of any schedule or project changes, enabling better planning and resource allocation.
Visualize your procurement plan with BIM-based procurement
Procurement requirements can be generated directly from the BIM model, from a catalog, or from a cost estimate. Design models, cost information, procurement and construction plans are visualized and evaluated during the planning phase, so that a clear and optimized plan is created before physical construction begins. This not only ensures data accuracy but can result in immense savings in time and labor.
Solid data basis for efficient facility management
With 5D BIM, the entire lifecycle of the building or object is presented in BIM 5D in the preconstruction phase. This eliminates the need for multiple disjointed spreadsheets and lists that many project teams currently rely on. Utilizing 5D BIM throughout the building lifecycle ensures all stakeholders always have access to the information they need, streamlining building maintenance and repairs, and resulting in more efficient facility management.